Park Forge Group
Contact UsWalking Trails: Pathways to Explore and Connect
At Park Forge Group, we design and construct walking trails that invite people to explore, connect, and enjoy the natural beauty of their surroundings. Whether through serene bushland, urban parks, or coastal landscapes, our trails are built with precision, durability, and environmental sensitivity in mind.
Combining thoughtful design with expert craftsmanship, we create pathways that are safe, accessible, and harmonious with the environment. Discover how our walking trails enhance communities, promote wellness, and celebrate the great outdoors.
Fitzgibbon Fire Break
Project Details
PROJECT: Firebreak Fitzgibbon Chase – Brisbane City Council
Park Forge recently completed the construction of a firebreak surrounding residential property located in Fitzgibbon Chase and the associated civil construction works required to complete this project for the Brisbane City Council.
These works included several major challenges that Park Forge were able to rectify for our Client. Works included were:
- Site preparation with clearance of corridor without injury to fauna and flora
- Construction of a firebreak on geotextile in up to 700mm of water in 3 stages
- Sediment and erosion control, including silt socks to hard surfaces and geotextile filter fabric
Milne Hill Walking Track